Warehouse( Interlock Manufacturing Factory ) with Store Room, Garbage Room & Compound Wall
جميع المشاريع
Factoryقيد التنفيذ

Warehouse( Interlock Manufacturing Factory ) with Store Room, Garbage Room & Compound Wall

INDUSTRIAL-11, Sharjah

رقم المشروع
378
القطاع
Factory
الموقع
INDUSTRIAL-11, Sharjah
المساحة المبنية
15,508 قدم مربع
تاريخ البدء
سبتمبر 2025
الاستشاري
Future Engineering Consultants

نطاق العمل

Warehouse( Interlock Manufacturing Factory ) with Store Room, Garbage Room & Compound Wall

Construction of a new warehouse facility within the existing Arabian German Interlock Factory premises. The proposed development includes a dedicated warehouse building designed to support the storage and handling of interlock manufacturing materials and finished products. The project also comprises a separate store room for the organized storage of tools, equipment and other essential materials, along with a designated garbage room for proper waste collection and management. The entire facility will be constructed with durable, high-quality building materials and suitable finishes to ensure strength, functionality and long-term durability. A compound wall (C/W) will also be provided to ensure proper site enclosure, security and controlled access. The proposed construction is intended to support and enhance the existing factory operations and storage facilities.

صور من الموقع

  1. أكتوبر 2026الأحدثالشهر 14 · صورة واحدة

  2. تاريخ البدءسبتمبر 2025

اطلب عرض سعر

الأحد - الخميس: 8:00 صباحاً - 8:00 مساءً

Warehouse( Interlock Manufacturing Factory ) with Store Room, Garbage Room & Compound Wall — INDUSTRIAL-11, Sharjah | الحوتي